Welding strip

Welding strip to install SOPREMAPOOL 3D and FEELING membranes (edge-to-edge installation).

Description

Dimensions: 25 m x 0.15 m

Implementation

Setting method:
  1. Glue the welding strip directly on the support.
  2. Carry out the welding of the membranes in the center of the welding strip. First, a membran will be welded and later, with the help of the Welding Tester, it must be verified that the weld is well done.
  3. Proceed in the same way with the second membrane (without leaving space between them), trying not to leave a space greater than 1 mm between them or allowing any overlap. The weld should also be checked.

Videos

    Associated products