
Welding strip
Welding strip to install SOPREMAPOOL 3D and FEELING membranes (edge-to-edge installation).
Welding strip to install SOPREMAPOOL 3D and FEELING membranes (edge-to-edge installation).
You can select and download the documents
Setting method:
- Glue the welding strip directly on the support.
- Carry out the welding of the membranes in the center of the welding strip. First, a membran will be welded and later, with the help of the Welding Tester, it must be verified that the weld is well done.
- Proceed in the same way with the second membrane (without leaving space between them), trying not to leave a space greater than 1 mm between them or allowing any overlap. The weld should also be checked.
This product exists in the following configurations
Product reference | Colour | Length | Width | Thickness |
---|---|---|---|---|
00157622 | GC Light Grey | 25 m | 15 cm | 1.5 mm |